Application case of metal hose in Xiamen Metro Lianhua lvcuo wushipu station
The official website of Shanghai Songjiang shock absorber Group Co., Ltd. introduces to you: metal hose in Xiamen Metro Lianhua lvcuo wushipu station. We provide metal hoses, corrugated compensators and other products for subway projects all over the country. The following is the contract information of metal hoses and corrugated compensators for Lianhua, lvcuo and wushipu stations of Xiamen subway. The following is the real supply contract. Please do not reprint or modify it.
Introduction to Xiamen Metro Lianhua lvcuo wushipu station
Xiamen Metro Line 1 is the first line of Xiamen Metro to be put into operation. It began trial operation on December 31, 2017, and its representative color is orange.
Xiamen Metro Line 1 starts from Zhenhai Road station, passes through Siming District, Huli District, Jimei District, runs through Jimei new city, Xiamen north station, and ends at yannei station, roughly in a north-south direction.
Xiamen Metro Line 1 is 30.3 kilometers long, including 25.6 kilometers of underground section, 1.9 kilometers of ground section and 2.8 kilometers of elevated section; There are 24 stations in total, including 1 elevated station and 23 underground stations; 6-car B-type train is adopted.
As of December 30, 2018, Xiamen Metro Line 1 has transported 41.6609 million passengers in the first anniversary of its trial operation.
Contract introduction of metal hose in Xiamen Metro Lianhua lvcuo wushipu station
Application case of metal hose in Xiamen Metro Lianhua lvcuo wushipu station
Related links: Metal hose